logo

Tom Burke Solar Park

Sector: Solar • Location: South Africa

Source: World Bank Group

Project
Active

The 66MW Tom Burke photovoltaic plant reached financial closure, as Enel began construction in March 2015. This BOO project worth of US$87.7 million would entail the development of solar pv power plant, located in Limpopo Province. It was a part of Window 3 of the Renewable Energy Independent Power Producer Procurement Programme (REIPPPP) by Department of Energy (DoE). The project was owned wholly

Project Information FAQ

Project Information

4 Q
The project “Tom Burke Solar Park” is an infrastructure initiative in the Solar sector, located in South Africa. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The 66MW Tom Burke photovoltaic plant reached financial closure, as Enel began construction in March 2015. This BOO project worth of US$87.7 million would entail the development of solar pv power plant, located in Limpopo Province. It was a part of Window 3 of the Renewable Energy Independent Power Producer Procurement Programme (REIPPPP) by Department of Energy (DoE). The project was owned wholly owned by Enel Green Energy. The details on the debt financing is not publicly available yet and will be updated soon. Once fully operational, this would generate up to 122 GWh per year once up and running. This output would be equivalent to the energy needs of around 38 thousand South African households and allows to avoid the emission of over 111 thousand tonnes of CO2 into the atmosphere each year. The energy generated by this new wind farm would be sold to the South African utility Eskom through a 20-year power supply agreement. http://africabusinesscommunities.com/news/enel-green-power-works-begin-on-three-new-plants-in-south-africa.html Cost of the project calculated based on the article below. 66(MW)/148.5(MW) x 197.3 (US$ million) = 87.7 (US$ million) Italian energy company TerniEnergia has signed a deal with an unnamed utility firm to develop two solar plants in South Africa for US$197.3mn solarpanel-AchimRaschka-wikimediaThe two plants will have a combined capacity of 148.5MW. (Image source: AchimRashka/Wikimedia Commons) The two plants will have a combined installed capacity of 148.5MW, the company said in a statement. The first 82.5MW plant would be installed in Paleisheuwel, Western Cape, while the second 66MW plant would be built at Tom Burke. According to the agreement, the Italian company’s subsidiary TerniaEnergy Projects will carry out all engineering, procurement and construction (EPC) activities as well as operations and maintenance (O&M). Panel and inverter supplies are also included in the contract. However, the deal is subject to approval by the European utility company and the South Africa

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data