logo
ProjectStart

Tom Hornecker Recreation Centre - Building Envelope

The status, timeline and source of this project. A free account opens every field.

Source: Dodge USA

The scope of work includes Over cladding the existing uninsulated walls with an exterior insulated finishing system (EIFS) or other functional cladding system (incorporate air and vapour barriers, reduce thermal transfer); Re-installing existing metal cladding with sufficient breaks to resist heat flow; Ensuring all transition detailing retains continuity of the air, vapour and moisture barriers;

Status
Prospective
Sector
Commercial, Geothermal, Metal, Water Supply and Storage, Government, Road, Manufacturing (Industrial)
Location
Nanton, Alberta, Canada
Updated
19 Nov 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about Tom Hornecker Recreation Centre - Building Envelope

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Tom Hornecker Recreation Centre - Building Envelope” is an infrastructure initiative in the Commercial sector, located in Nanton, Alberta, Canada. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

start

Taiyo status

Prospective

Taiyo last update

2026-11-19

Contact

Not available for this record.

Description

Description

The scope of work includes Over cladding the existing uninsulated walls with an exterior insulated finishing system (EIFS) or other functional cladding system (incorporate air and vapour barriers, reduce thermal transfer); Re-installing existing metal cladding with sufficient breaks to resist heat flow; Ensuring all transition detailing retains continuity of the air, vapour and moisture barriers; Isolated curtain wall repairs at the south entrance to address water ingress risks and air leakag...

Procurement method

Location

Country

Canada

State

Alberta

City

Nanton

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Commercial, Geothermal, Metal, Water Supply and Storage, Government, Road, Manufacturing (Industrial)

Article published date

2024-02-22

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project