Tomago 500MW Grid-Scale Battery Project
Under construction · New South Wales · Last reported Dec 2025
Source: Asian Power
The Tomago Battery is a 500 megawatt (MW), 4-hour duration (2,000 megawatt-hour (MWh)) capacity grid-scale battery being constructed at Tomago in New South Wales. It aims to improve grid reliability by storing power for use when energy demand exceeds generation. The project is expected to create up to 200 jobs during construction and 6 ongoing jobs upon operationalisation.
- Status
- Under Construction
- Sector
- Manufacturing (Industrial), Energy Storage, Power Generation (CCGT)
- Location
- Tomago, New South Wales, Australia
- Updated
- 22 Jul 2026
- Source
- Asian Power
ConstructChat
Ask ConstructChat about Tomago 500MW Grid-Scale Battery Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | under construction |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Tomago Battery is a 500 megawatt (MW), 4-hour duration (2,000 megawatt-hour (MWh)) capacity grid-scale battery being constructed at Tomago in New South Wales. It aims to improve grid reliability by storing power for use when energy demand exceeds generation. The project is expected to create up to 200 jobs during construction and 6 ongoing jobs upon operationalisation. |
Original sector | Energy |
Budget |
Location
Country | Australia |
State | New South Wales |
City | Tomago |
Source
Source | Asian Power |
URL |
More Details
Record type | Project |
Sector | Manufacturing (Industrial), Energy Storage, Power Generation (CCGT) |
Article published date | 2025-12-10 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
