Tomago Big Battery Project
The owner, status and timeline of this project. A free account opens every field.
Source: RenewEconomy
A large battery storage project with a capacity of 500 MW and 2,000 MWh, aimed at smoothing out grid consumption spikes from data centres and AI workloads. The project is part of Fluence's contracts in Australia to provide battery energy storage solutions that can absorb rapid surges in power and release it during high demand intervals, offering both behind the meter and grid level flexibility.
- Status
- Closed
- Sector
- Power Generation (CCGT), Data Center, Energy Storage
- Location
- Tomago, Australia
- Updated
- 22 Jul 2026
- Source
- RenewEconomy
ConstructChat
Ask ConstructChat about Tomago Big Battery Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | awarded |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | A large battery storage project with a capacity of 500 MW and 2,000 MWh, aimed at smoothing out grid consumption spikes from data centres and AI workloads. The project is part of Fluence's contracts in Australia to provide battery energy storage solutions that can absorb rapid surges in power and release it during high demand intervals, offering both behind the meter and grid level flexibility. |
Original sector | Energy Storage |
Budget |
Location
Country | Australia |
City | Tomago |
Source
Source | RenewEconomy |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Data Center, Energy Storage |
Article published date | 2025-08-14 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
