Tomasina port concession
Active · Madagascar
Source: World Bank Group
The project entails the 15 years concession of The Port of Toamasina. The management contract winner is ICTSI. Total value of the deal was not disclosed. A new 756-meter container berth, with a draught of -16 meters alongside and equipped with ship-to-shore container gantries, is central to plans to provide for increases of vessel size up to a capacity of 14,000 TEUs. The value of the contract is
- Status
- Prospective
- Sector
- Seaport, Water Supply and Storage, Government
- Location
- Madagascar
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about Tomasina port concession
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | Active |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project entails the 15 years concession of The Port of Toamasina. The management contract winner is ICTSI. Total value of the deal was not disclosed. A new 756-meter container berth, with a draught of -16 meters alongside and equipped with ship-to-shore container gantries, is central to plans to provide for increases of vessel size up to a capacity of 14,000 TEUs. The value of the contract is not disclosed. The concession was signed on December 13, 2021. https://www.ictsi.com/press-releases/ictsi-madagascar-concession-extended |
Original sector | Transport |
Procurement method |
Location
Country | Madagascar |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Seaport, Water Supply and Storage, Government |
Article published date | 2024-09-20 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
