Tomassoni Memorial Arch
Sector: Car parking • Location: Chisholm, Minnesota, United States of America
Source: Dodge USA
The proposed work includes, but is not limited to the following major quantities: 35 LF Remove Curb and Gutter 75 SY Remove and Replace Bituminous Pavement 100 CY Common Excavation 62 CY Select Granular Borrow 160 SY Geotextile Fabric Type 5 10 Each Helical Pile Load Testing 265 LF Helical Piling 40 CY Random Riprap Class III 1300 SF 6" Concrete Walk 400 SF 6" Colored Concrete Walk - Stamped 35 LF
- Status
- Closed
- Sector
- Car parking, Cement, Road, Manufacturing (Industrial), Automotive, Government, Commercial
- Location
- Chisholm, Minnesota, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Tomassoni Memorial Arch
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The proposed work includes, but is not limited to the following major quantities: 35 LF Remove Curb and Gutter 75 SY Remove and Replace Bituminous Pavement 100 CY Common Excavation 62 CY Select Granular Borrow 160 SY Geotextile Fabric Type 5 10 Each Helical Pile Load Testing 265 LF Helical Piling 40 CY Random Riprap Class III 1300 SF 6" Concrete Walk 400 SF 6" Colored Concrete Walk - Stamped 35 LF Concrete Curb and Gutter 32 SF Truncated Domes 1 Each Deciduous Tree 30 Each Deciduous Shrub 75 ... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Minnesota |
City | Chisholm |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Car parking, Cement, Road, Manufacturing (Industrial), Automotive, Government, Commercial |
Article published date | 2024-08-12 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Car parking projects in United States of America
- FRANKLIN CO. AIRPORT DRIVES & PARKING
- SR 7 FROM FLORIDA STATE LINE TO NSR
- SIMPSON STREET/JONES AVE FM NORTHSIDE DR TO LUCKIE ST- GRTA
- CULVERT & BRIDGE CULVERT DURHAM PARK ROAD
- SR 9 @ CR 3705/AC SMITH RD
- CR 478/MOULTRIE LENOX RD @ LITTLE RVR 9 MI E OF NORMAN PARK
- I-285 FM I-75/CLAYTON THRU FULTON TO I-20/DEKALB
- LINCOLNTON DOWNTOWN STREETSCAPE - PHASE II
