Tonglu - Zhaiqi Toll Road
Sector: Road • Location: China
Source: World Bank Group
FACB, through its wholly-owned subsidiary Alpha Terrace, entered into a joint-venture with Tonglu Transportation Investment Co. Ltd. (state owned company) to construct and operate the toll road linking Tonglu and Zhaqi. FACB acquired 55% of the project company's shares, while Tonglu acquired 45%; subsequently, Tonglu divested 12.5% of its shares to Zhejiang Oil Refinery Investment Co. Ltd. The tot
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | active |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | FACB, through its wholly-owned subsidiary Alpha Terrace, entered into a joint-venture with Tonglu Transportation Investment Co. Ltd. (state owned company) to construct and operate the toll road linking Tonglu and Zhaqi. FACB acquired 55% of the project company's shares, while Tonglu acquired 45%; subsequently, Tonglu divested 12.5% of its shares to Zhejiang Oil Refinery Investment Co. Ltd. The total investment of the project amounted to US$ 19.2 million (Rmb$ 160 million), of which US$ 10.6 million (Rmb$ 88 million) was to be supplied by FACB. The toll road has been in operation since the joint-venture agreement was signed, but toll collections only started in 3/97. Of the US$ 10.6 million (Rmb$ 88 million) to be paid by FACB for the 55% equity, US$ 4.2 million (Rmb$ 35.2 million) was paid between 01/97 and 03/97; FACB was required to pay 15% on the outstanding balance. On 3/99, FACB sold its 55% shares back to Tonglu Transportation for US$ 4.3 million (Rmb$ 35.7 million); the company argued that the rate of return on the project was not enough to match the 15% interest rate of the outstanding balance the company had to pay to Tonglu Transportation. None None |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
