logo

Tonglu County Solid Waste Incineration Power Plant

Sector: Power Generation (CCGT) • Location: China

Source: World Bank Group

Project
Active

In Apr 2012, a local private company Anhui Shengyun Machinery Company Limited was granted a concession agreement to rehabilitate and operate a household solid waste incineration power plant in Tonglu County, Anhui Province. Shengyun paid US$ 16.16 million (RMB 102.0352 million) to get the already installed garbage processing facility of the plant and would invest more money to equip the facility e

Project Information FAQ

Project Information

4 Q
The project “Tonglu County Solid Waste Incineration Power Plant” is an infrastructure initiative in the Power Generation (CCGT) sector, located in China. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

In Apr 2012, a local private company Anhui Shengyun Machinery Company Limited was granted a concession agreement to rehabilitate and operate a household solid waste incineration power plant in Tonglu County, Anhui Province. Shengyun paid US$ 16.16 million (RMB 102.0352 million) to get the already installed garbage processing facility of the plant and would invest more money to equip the facility electricity generation capacity of 9MW. The total investment was about US$ 31.68 million (RMB 200 million). A special purpose vehicle Tonglu Shengyun Environmental Protection and Energy Company Limited was set up to implement the project, with a registration capital of US$ 7.92 million (RMB 50 million). The concessional term was from Jan 1, 2012 through to Dec 31, 2038, covering the construction period. Shengyun had a 100% stake in the entire project.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data