logo

Tongue River Dam PLC Replacement

Sector: Hydro • Location: Decker, Montana, United States of America

Source: Dodge USA

Project
Bidding

Tongue River Dam PLC Replacement Engineering firms qualified to perform engineering design and installation administration services associated with the Gate Control PLC Replacement project at Tongue River Dam in Bighorn County, Montana. The work will generally consist of reviewing existing information, engineering design, preparing engineering reports, preparing the Project Manual (contract docume

Status
Prospective
Sector
Hydro, Manufacturing (Industrial), Commercial, Water Supply and Storage
Location
Decker, Montana, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about Tongue River Dam PLC Replacement

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Tongue River Dam PLC Replacement” is an infrastructure initiative in the Hydro sector, located in Decker, Montana, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

Bidding

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Tongue River Dam PLC Replacement Engineering firms qualified to perform engineering design and installation administration services associated with the Gate Control PLC Replacement project at Tongue River Dam in Bighorn County, Montana. The work will generally consist of reviewing existing information, engineering design, preparing engineering reports, preparing the Project Manual (contract documents, drawings, and specifications), assisting with project bidding, providing installation inspec...

Procurement method

Budget

Location

Country

United States of America (USA)

State

Montana

City

Decker

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Hydro, Manufacturing (Industrial), Commercial, Water Supply and Storage

Article published date

2024-10-14

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project