Tongue River Slough Construction
The status, timeline and source of this project. A free account opens every field.
Source: Dodge USA
The projectconsists of: The project involves the regrading of the 2.7 mile long TongueRiver slough with the replacement and installation of new culverts in roadcrossings of the slough. It also includes the construction of a new stormwaterlift station and overflow channel.
- Status
- Prospective
- Sector
- Water Supply and Storage, Waste Processing and Treatment, Government, Commercial
- Location
- Miles City, Montana, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Tongue River Slough Construction
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bidding |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The projectconsists of: The project involves the regrading of the 2.7 mile long TongueRiver slough with the replacement and installation of new culverts in roadcrossings of the slough. It also includes the construction of a new stormwaterlift station and overflow channel. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Montana |
City | Miles City |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Waste Processing and Treatment, Government, Commercial |
Article published date | 2024-12-16 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
