Toowoomba Bypass
Sector: Automotive • Location: Australia
Source: Ferrovial
Ferrovial Business Lines Projects Toowoomba Bypass Toowoomba, Australia Nexus Infrastructure AU$1.04B Investment 41km Of length 2018-2043 Construction Period 25 Concesion Period The project consists of a 41km bypass route to the north of Toowoomba, significantly improving driver safety and journey time reliability by removing heavy vehicles from the central business district of Australia’s secon
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | active |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | Ferrovial Business Lines Projects Toowoomba Bypass Toowoomba, Australia Nexus Infrastructure AU$1.04B Investment 41km Of length 2018-2043 Construction Period 25 Concesion Period The project consists of a 41km bypass route to the north of Toowoomba, significantly improving driver safety and journey time reliability by removing heavy vehicles from the central business district of Australia’s second largest inland city. The project has delivered long-term benefits to Queensland and provided a safer, faster link to the ports and southeast to Brisbane, reducing travel time by up to 40 minutes. The Toowoomba Second Range Crossing comprises of the design, build, finance, operation and maintenance of a new four-lane bypass. The project was delivered as a PPP and is the largest Australian Government funding commitment to a single road project in Queensland’s history. The Crossing connects the Warrego Highway at Helidon Spa in the east, to the Gore Highway at Athol in the west via Charlton, increasing economic activity in the region by AU$2.4bn over 30 years. Ferrovial Construction, as a Design and Construct JV partner of the Nexus Infrastructure consortium, was awarded the contract to design and construct the $1.6 billion Toowoomba Second Range Crossing. We completed the design and construction of the Crossing in September 2019 and our sister company, Cintra, will finance, operate and maintain the new infrastructure for 25 years. This will be Cintra’s first asset in Australia, strengthening the company’s position for future opportunities in the market. Key Features Four lanes from Warrego Highway east interchange to Warrego Highway westGrade separated interchanges at Warrego Highway west, Toowoomba-Cecil Plains Road interchange and Gore HighwayA grade separated connection to Mort StreetAn approximately 30m deep cutting at the top of the Toowoomba Range was constructed as an alternative to the tunnel solution detailed in the reference design to allow all heavy vehicles, including dangerous goods carriers and over-dimensional vehicles, to use the CrossingAn 800m long viaduct built over the existing Queensland Rail line, connecting the Lockyer Valley and the Toowoomba Range escarpment and providing continuity of the New England highway through bridges over the new cutting. The viaduct also greatly reduces operational maintenance costs for not only the concession period, but beyondDiversion of almost 80% of heavy and super-heavy commercial vehicles away from the existing local roadsIncreasing freight efficiencies, road and driver safety and enhancing liveability for the Toowoomba and Lockyer Valley areas About the Highway Management Cintra’s first asset in Australia, strengthening the company’s position for future opportunities in the market. Its Innovative design replaced tunnel with a viaduct. That allows hazardous and over-sized vehicles to utilize the bypass. The viaduct also greatly reduced operations in maintenance costs for not only the concession period, but beyond. The Nexus design also removed atgrade crossing that greatly improves safety and efficiency for the users. Toowoomba Bypass reduces journey times for heavy commercial vehicles by up to 40 minutes and moves it away from Toowoomba’s city centre. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | Medium |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
