logo

Toro Creek Bridge Replacement

Sector: Bridge • Location: California, United States of America (USA)

Source: California Department of Transportation (Caltrans)

Project
Under Construction

The bridge replacement project is under construction by Souza Construction, Incorporated, with in-creek work planned for June 1, 2022. The project proposes to upgrade existing geometric and seismic deficiencies on the existing northbound Toro Creek Bridge (Bridge Number 49-68R) by constructing bridge rails that meet updated roadside safety hardware testing and standard shoulder widths via replacem

Project Information FAQ

Project Information

5 Q
The project “Toro Creek Bridge Replacement” is an infrastructure initiative in the Bridge sector, located in California, United States of America (USA). Taiyo aggregates data on it from California Department of Transportation (Caltrans).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

under construction

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The bridge replacement project is under construction by Souza Construction, Incorporated, with in-creek work planned for June 1, 2022. The project proposes to upgrade existing geometric and seismic deficiencies on the existing northbound Toro Creek Bridge (Bridge Number 49-68R) by constructing bridge rails that meet updated roadside safety hardware testing and standard shoulder widths via replacement of the existing bridge structure. Other work will include placing rock slope protection, upgrading guardrail and end treatments, and adding plant establishment. The new bridge will comply with current seismic, hydraulic, and structural standards. The bridge will maintain the existing two traffic lanes and provide improvements that will include Manual for Assessing Safety Hardware-compliant bridge rails and standard shoulders that will accommodate a Class III bicycle route. The bridge approaches will also be modified to match the existing roadway with the new bridge. Bicycle traffic will also be detoured during construction. Bicycle and vehicle traffic will be detoured onto the southbound Toro Creek Bridge, and both the northbound and southbound traffic will have a dedicated one lane in each direction through the construction duration (expected to be through spring 2023).

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data