logo

Toronto Subway

Sector: Automotive • Location: Canada

Source: FCC Construction

Project
Closed

The project consisted of building a 4.5 kilometres underground section with three stations in between, York University Station (only temporary works), Steeles West Station (not included in this contract) and Highway 407 Station, as well as an area for manoeuvres and parking (SEM). There will be three emergency exits, three connecting cross-galleries, an extraction shaft to remove the tunnel boring

Project Information FAQ

Project Information

3 Q
The project “Toronto Subway” is an infrastructure initiative in the Automotive sector, located in Canada. Taiyo aggregates data on it from FCC Construction.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The project consisted of building a 4.5 kilometres underground section with three stations in between, York University Station (only temporary works), Steeles West Station (not included in this contract) and Highway 407 Station, as well as an area for manoeuvres and parking (SEM). There will be three emergency exits, three connecting cross-galleries, an extraction shaft to remove the tunnel boring machine, and three working shafts.The Highway 407 Station is a newly built subway station that is 165 metres long, 22 metres wide and 23 metres deep; with a central platform and three levels, two underground and one on ground level. The ground level station is made up of a Y-shaped building with a metal structure and curtain walls. It has a bus station and a car park with 600 spaces. All of the architectural installations and finishes are carried out.Two parallel tunnels are being built, each 4.5 kilometres long with an inner diameter of 5.4 metres. The separation between the tunnel axes is 13.6 metres. The lining consists of 1.5 metres long rings made up of 4 +2 concrete segments, each 0.235 metres thick.The tunnel is constructed using two EPB tunnel boring machines in three stages: the first from the working shaft (LS1), moving south until reaching the shaft before the manoeuvres and parking area, with a total length of 1,672 kilometres. The tunnel boring machines are dissembled and transported to the second tunnel drive in the Highway 407 station, and excavation is carried out southbound until reaching the Steeles West station, with a total length of 1,024 kilometres. The tunnel boring machines are again dissembled and transported to the third tunnel drive in the Highway 407 station, and excavation is carried out northbound until reaching the end of the line (Vaughan Metropolitan Centre station), with a total length of 936 metres.The Manoeuvres and Parking area is 221 metres long and consists of three drying tunnels with a similar cross-section to that of the line executed using the NATM method (also known as Sequential Excavation Method – SEM) from two working shafts, one at each end.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

Low

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data