Toronto’s Ravine Strategy Project
One of 10,000+ projects Taiyo tracks in Ontario.
Source: Infrastructure Canada
The Project involves the creation and restoration of wetlands, which aims to improve the infiltration and detention of stormwater, directly improving water quality in streams and catchment rivers. In addition, the project will create a trail network and implement wayfinding signage to improve access to nature. The conversion of a hydro corridor to a native meadow habitat will improve soil quality,
- Status
- Under Construction
- Sector
- Hydro, Water Supply and Storage
- Location
- Ontario, Canada
- Updated
- 22 Jul 2026
- Source
- Infrastructure Canada
ConstructChat
Ask ConstructChat about Toronto’s Ravine Strategy Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | in progress |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Project involves the creation and restoration of wetlands, which aims to improve the infiltration and detention of stormwater, directly improving water quality in streams and catchment rivers. In addition, the project will create a trail network and implement wayfinding signage to improve access to nature. The conversion of a hydro corridor to a native meadow habitat will improve soil quality, water infiltration and flood mitigation. |
Original sector | Other |
Location
Country | Canada |
State | Ontario |
Source
Source | Infrastructure Canada |
URL |
More Details
Record type | Project |
Sector | Hydro, Water Supply and Storage |
Article published date | 2026-05-03 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Hydro projects in Canada
- Suncor Millennium Naptha Unit and Hydrogen Plant
- Residue Storage Areas and Dams
- Ligne à 120 kV du Grand-Brûlé–Dérivation Saint-Sauveur
- Modernisation du réseau de l’Estrie
- Projets et travaux de construction
- Poste d’Argenteuil à 315‑120‑25 kV et lignes d’alimentation
- Projet de déclassement de la centrale de Gentilly-2
- La Vérendrye-Parent
