Torrent Power 300 MW Wind Power Project
Sector: Solar • Location: India
Source: Equitypandit
Torrent Power won the bid for a 300 megawatt (MW) wind power project awarded by the Solar Energy Corporation of India (SECI). Its wholly owned subsidiary, Torrent Green Energy, will develop the wind plant, which is expected to become operational within 24 months of signing the Power Purchase Agreement.
- Status
- Prospective
- Sector
- Solar, Wind, Power Generation (CCGT)
- Location
- India
- Updated
- 22 Jul 2026
- Source
- Equitypandit
ConstructChat
Ask ConstructChat about Torrent Power 300 MW Wind Power Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Planned |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Torrent Power won the bid for a 300 megawatt (MW) wind power project awarded by the Solar Energy Corporation of India (SECI). Its wholly owned subsidiary, Torrent Green Energy, will develop the wind plant, which is expected to become operational within 24 months of signing the Power Purchase Agreement. |
Original sector | Energy |
Location
Country | India |
Source
Source | Equitypandit |
URL |
More Details
Record type | Project |
Sector | Solar, Wind, Power Generation (CCGT) |
Article published date | 2025-06-14 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
