logo

Torrent Sangli 75MW Windfarm

Sector: Wind • Location: India

Source: World Bank Group

Project
Active

Torrent Power Limited entered into an agreement with Maharashtra Government to develop a 75MW wind farm located at Sangli district (spread across 7 villages - Bhud, Madalmuthi, Devikhind, Balawadi, Mainganwadi, Valvan, and Gharniki), in the state of Maharashtra. The windfarm would involve the building of 50 ReGen make V82 gearless wind turbines of 1500KW capacity each. The windfarm was designed at

Status
Prospective
Sector
Wind, Raw Materials, Telecommunications, Power Generation (CCGT), Government, Residential, Commercial
Location
India
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Torrent Sangli 75MW Windfarm

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Torrent Sangli 75MW Windfarm” is an infrastructure initiative in the Wind sector, located in India. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

Active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Torrent Power Limited entered into an agreement with Maharashtra Government to develop a 75MW wind farm located at Sangli district (spread across 7 villages - Bhud, Madalmuthi, Devikhind, Balawadi, Mainganwadi, Valvan, and Gharniki), in the state of Maharashtra. The windfarm would involve the building of 50 ReGen make V82 gearless wind turbines of 1500KW capacity each. The windfarm was designed at a load factor of 20.72%. The electricity generated from the project would be evacuated to Northern, Eastern, Western and North-Eastern grid of India. Apart from the WTGs, the project activity also involved the installation of transformers, transmission lines/ cables and other equipment required for the generation and transfer of electricity to the grid.Power evacuation would be done by 33kV transmission line and the 110kV/132kV substation. Torrent Sangli Windfarm would sell the power to Maharashtra State Electricity Distribution Company Ltd (MSEDCL) through a 13-year PPA.The APPC (Average Power Purchase Cost) base tariff as per MERC tariff order (dated 29 April 2011 for Wind zone 1) was US$ 0.10/Unit (INR 5.37 per unit @53.44 INR/USD) for the first 13 years of operation. The transmission charges would be paid by Torrent Power to the state transmission utility.The total capacity of 75MW was eligible under REC as per the CERC and CDM benefits under UNFCC. Contracts for supply, erection and O&M had been executed with Regen Powertech Private Limited for this project in March 2012. Financial closure took place on 28th June 2012.The total project cost at the time of financial closure was US$ 97.5mn (INR 5208.4mn @ 53.44 INR/uSD).The debt equity ratio for the project was about 80/20. Financing comprised of a 13-year term loan of USD 77.8mn (INR 4160mn) and sponsor equity of US$ 19.6mn (INR 1048.4mn). The term loan had a repayment schedule of 52 quarterly installments. The term loan was arranged by IDFC. Construction started in March 2012 and was expected to be completed by March 2013.

Original sector

Energy

Budget

Location

Country

India

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Wind, Raw Materials, Telecommunications, Power Generation (CCGT), Government, Residential, Commercial

Article published date

2024-09-27

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project