Total Bridge Replacement
Sector: Government • Location: Missouri, United States of America
Source: Dodge
The project scope includes, but isnot limited to, all materials, labor, excavation, bridge construction, and guardrailinstallation.Project Scopehe successful bidder will be required to provide all labor, materials, equipment, andsupervision necessary to complete the bridge replacement project. This includes, but isnot limited to:e Demolition and Removal of existing wood.e Excavation and site prepa
- Status
- Closed
- Sector
- Government, Road, Commercial, Bridge
- Location
- Missouri, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Total Bridge Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project scope includes, but isnot limited to, all materials, labor, excavation, bridge construction, and guardrailinstallation.Project Scopehe successful bidder will be required to provide all labor, materials, equipment, andsupervision necessary to complete the bridge replacement project. This includes, but isnot limited to:e Demolition and Removal of existing wood.e Excavation and site prepa... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Missouri |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Government, Road, Commercial, Bridge |
Article published date | 2025-01-27 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
