Totora Copper-Gold Drilling Program
Under construction · Chile · Last reported Mar 2026
Source: Mining.com.au
ATERRA Metals has begun a phase one drilling program at the Totora Copper-Gold Project in Chile, targeting two of four near-surface porphyries. The program comprises 3,000m of drilling focusing on the Totora and Frontera deposit porphyries within its 1,811-hectare project, located 60km south of Vallenar. The goal is to publish a resource estimate during the third quarter of 2026 integrating phase
- Status
- Under Construction
- Sector
- Metal
- Location
- Vallenar, Chile
- Updated
- 22 Jul 2026
- Source
- Mining.com.au
ConstructChat
Ask ConstructChat about Totora Copper-Gold Drilling Program
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | under construction |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | ATERRA Metals has begun a phase one drilling program at the Totora Copper-Gold Project in Chile, targeting two of four near-surface porphyries. The program comprises 3,000m of drilling focusing on the Totora and Frontera deposit porphyries within its 1,811-hectare project, located 60km south of Vallenar. The goal is to publish a resource estimate during the third quarter of 2026 integrating phase one drill assay results with significant historical drilling. |
Original sector | Mining |
Location
Country | Chile |
City | Vallenar |
Source
Source | Mining.com.au |
URL |
More Details
Record type | Project |
Sector | Metal |
Article published date | 2026-03-29 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
