Touchmark Building Addition
Sector: Waste Processing and Treatment • Location: Bend, Oregon, United States of America
Source: Dodge
The Touchmark Duplexes at Pilot Butte project, to be located at 1301 NE Medical Center Dr, is an addition to the existing Touchmark facility located at 1125 NE Watt Way, Bend, OR 97701. The on-site work will include 13 proposed duplexes (25 units in total, with one structure to be a single unit). Development will include a 6 sanitary sewer service with a sampling manhole, a 4 domestic water servic
- Status
- Prospective
- Sector
- Waste Processing and Treatment, Water Supply and Storage, Power Transmission, Power Generation (CCGT), Residential, Manufacturing (Industrial), Commercial, Hospital
- Location
- Bend, Oregon, United States of America
- Updated
- 19 Nov 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Touchmark Building Addition
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | start |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | The Touchmark Duplexes at Pilot Butte project, to be located at 1301 NE Medical Center Dr, is an addition to the existing Touchmark facility located at 1125 NE Watt Way, Bend, OR 97701. The on-site work will include 13 proposed duplexes (25 units in total, with one structure to be a single unit). Development will include a 6 sanitary sewer service with a sampling manhole, a 4 domestic water service with a 4 DCVA, a CEC primary power line with a power plan yet to be created (we are in contact ... |
Budget |
Location
Country | United States of America (USA) |
State | Oregon |
City | Bend |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Waste Processing and Treatment, Water Supply and Storage, Power Transmission, Power Generation (CCGT), Residential, Manufacturing (Industrial), Commercial, Hospital |
Article published date | 2025-10-06 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Waste Processing and Treatment projects in United States of America
- JACK FOUNTAIN/HOLLOWAY RAY FM SNOWHILL CHURCH TO BRANCH
- West lake sammamish parkway phase 2
- 228th St. SE Roadway Repair near 15th Ave. SE
- Camden Lift Station
- REPLACE EXIST. CONVIENENCE STORE W/ NEW ONE, UPGRADE LANDSCA PE, SITE LIGHTING, DRAINAGE. ADD STARBUCKS DRIVETHRU W/ SPR
- PHASED APPROVAL FOR 1) METAL FRAMING & SHEETROCK & 2) 3 UNDE R SLAB DRAINS. REFER TO MAIN PERMIT 202205223
- (N) COMMERICAL SINKS: 3-COMPARTMENT SINK AND 2 ADDITIONAL SINKS WITH DRAINAGE AND WATER.
- NEW ADA BATHROOM PER PLAN AND SPECIFICATIONS AREA 66SF SCREE NED. (N) 4" SEWER LATERAL CONNECTION, (N) WATER FOUNDATION
