logo
ProjectClosed

TOURAH CEMENT EXPANSION

One of 989 projects Taiyo tracks in Egypt, Arab Republic of.

Source: World Bank Group

The project includes: (a) design, construction and commissioning of a cement production plant, including raw material handling equipment, raw material grinding plants, raw meal homogenization and storage plant, kiln plant, clinker grinding plant, gypsum grinding plant and cement transport and storage facilities, with a productive capacity of 660,000 TPY of clinker to be converted into cement of va

Status
Closed
Sector
Water Supply and Storage, Manufacturing (Industrial), Government
Location
Egypt
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about TOURAH CEMENT EXPANSION

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “TOURAH CEMENT EXPANSION” is an infrastructure initiative in the Water Supply and Storage sector, located in Egypt, Arab Republic of. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The project includes: (a) design, construction and commissioning of a cement production plant, including raw material handling equipment, raw material grinding plants, raw meal homogenization and storage plant, kiln plant, clinker grinding plant, gypsum grinding plant and cement transport and storage facilities, with a productive capacity of 660,000 TPY of clinker to be converted into cement of various types equivalent to 700,000 TPY of normal cement; (b) modification of existing raw material handling and clinker grinding facilities, including installation of new cement mills; (c) acquisition and installation of machinery and equipment for limestone and clay quarries and a limestone crushing plant; (d) acquisition and installation of bag-making units with pneumatic dispatch facilities; (e) design, construction and commissioning of a new 30 MVA electric substation, including the acquisition and installation of required equipment; (f) expansion and modernization of existing electrical and mechanical workshops and water supply facilities; (g) training and pre-operating and startup and testing expenses required for TCC to manage and operate the facilities.

Original sector

(Historic)Industry

Location

Country

Egypt

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Manufacturing (Industrial), Government

Article published date

2025-12-17

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project