TOURAH CEMENT EXPANSION
One of 989 projects Taiyo tracks in Egypt, Arab Republic of.
Source: World Bank Group
The project includes: (a) design, construction and commissioning of a cement production plant, including raw material handling equipment, raw material grinding plants, raw meal homogenization and storage plant, kiln plant, clinker grinding plant, gypsum grinding plant and cement transport and storage facilities, with a productive capacity of 660,000 TPY of clinker to be converted into cement of va
- Status
- Closed
- Sector
- Water Supply and Storage, Manufacturing (Industrial), Government
- Location
- Egypt
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about TOURAH CEMENT EXPANSION
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project includes: (a) design, construction and commissioning of a cement production plant, including raw material handling equipment, raw material grinding plants, raw meal homogenization and storage plant, kiln plant, clinker grinding plant, gypsum grinding plant and cement transport and storage facilities, with a productive capacity of 660,000 TPY of clinker to be converted into cement of various types equivalent to 700,000 TPY of normal cement; (b) modification of existing raw material handling and clinker grinding facilities, including installation of new cement mills; (c) acquisition and installation of machinery and equipment for limestone and clay quarries and a limestone crushing plant; (d) acquisition and installation of bag-making units with pneumatic dispatch facilities; (e) design, construction and commissioning of a new 30 MVA electric substation, including the acquisition and installation of required equipment; (f) expansion and modernization of existing electrical and mechanical workshops and water supply facilities; (g) training and pre-operating and startup and testing expenses required for TCC to manage and operate the facilities. |
Original sector | (Historic)Industry |
Location
Country | Egypt |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Manufacturing (Industrial), Government |
Article published date | 2025-12-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
