logo

TOURISM I

Sector: Road • Location: Turkey

Source: World Bank Group

Project
Closed

The project will provide the following infrastructure by 1981: (1) the Beldibi-Tekirova section of the new highway and access roads to Kemer and tourist development sites; (2) streets, electricity, water, sewerage, drainage, health, recreational and community facilities in Kemer; (3) a small craft harbor, a commercial and water sport center, and two ferry / excursion boats; (4) a 300 channel micro

Status
Closed
Sector
Road, Water Supply and Storage, Power Generation (CCGT), Biomass, Seaport, Hotel, Commercial, Waste Processing and Treatment, Government
Location
Turkey
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about TOURISM I

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “TOURISM I” is an infrastructure initiative in the Road sector, located in Turkey. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The project will provide the following infrastructure by 1981: (1) the Beldibi-Tekirova section of the new highway and access roads to Kemer and tourist development sites; (2) streets, electricity, water, sewerage, drainage, health, recreational and community facilities in Kemer; (3) a small craft harbor, a commercial and water sport center, and two ferry / excursion boats; (4) a 300 channel microwave link between Antalya and Kemer, a new telephone exchange at Kemer, upgrading of the existing telephone exchange of Antalya, a 45 km telephone network and 40 telex machines to be leased to hotels in the project area; (5) a water supply and sewerage and solid waste disposal system for the project area; (6) electric power facilities consisting of a 154kv line from the Kepez power station, a new transformer substation at Kemer, 31.5 kv lines from there to all project sites, and a standby power supply system for the project area; (7) a hotel training center in Kemer consisting of a school with a potential annual output of 375 graduates, a 250 - bed dormitory, and a 50 - room practice hotel; (8) 280 housing units in Kemer; (9) protection and access works for the Phaselis archaeological site; (10) beach facilities, three camping sites, and trails and other recreation facilities.

Original sector

(Historic)Urban Development

Location

Country

Turkey

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Road, Water Supply and Storage, Power Generation (CCGT), Biomass, Seaport, Hotel, Commercial, Waste Processing and Treatment, Government

Article published date

2025-12-17

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project