Towards lossless electrical energy converters
Forthcoming · Germany
Source: EU Funding & Tenders Portal
"Electrical energy is typically converted four times between source and load, by over 100.000 GW installed converters. Over 99% efficiency is already reality, e.g., in PV inverters, however in a trade-off with power-density and complexity. Thus, most converters stay below the technical performance limits. Incremental advances in semiconductor technology will continuously push these limits’ values,
- Status
- Prospective
- Sector
- Power Transmission, Bridge, Power Generation (CCGT), Education, Advanced Electronics, Government, Solar
- Location
- Germany
- Updated
- 19 Nov 2026
- Source
- EU Funding & Tenders Portal
ConstructChat
Ask ConstructChat about Towards lossless electrical energy converters
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | forthcoming |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | "Electrical energy is typically converted four times between source and load, by over 100.000 GW installed converters. Over 99% efficiency is already reality, e.g., in PV inverters, however in a trade-off with power-density and complexity. Thus, most converters stay below the technical performance limits. Incremental advances in semiconductor technology will continuously push these limits’ values, but does not fundamentally change it. This project takes a disruptive approach, investigating partial-power-processing (PPP): Recently, we operated a 99%-efficient 2-level half-bridge in a multilevel topology, increasing the external capacitive-load charging voltage and power 6-times, while keeping the inner losses almost constant. From 2 to 7 level operation monotonically improved the system efficiency from 99% to over 99.7%. A global maximum was not yet reached. PPP theoretically reduces the losses by a factor of N, if only 1/N of the power is converted by a lossy converter while most power is delivered directly to the load by almost-lossless bypass switches from energy buffers. The question is: ""How can electrical conversion efficiency be further increased with partial-power-processing, targeting 99.9% for selected loads?” To approach this “lossless” energy conversion, we will (1) theoretically further investigate PPP and many-level converter topologies, semiconductor devices, and operation parameters, (2) design and characterize converters with two cascaded stages of internally already PPP converter-submodules in a novel way to further improve the system efficiency 3 times (to 99.9%). We will investigate (3) low-voltage (< 100 V), medium-voltage (< 1000 V) and high-voltage (< 10 kV) PPP converters, and cascade them to multiply their benefits. (4) Application to selected, initially capacitive-load applications (electrocaloric heat-pump, pyroelectric harvester, dielectric actuators). The project will push electrical energy conversion further towards the “lossless” limit." |
Procurement method |
Location
Country | Germany |
Source
Source | EU Funding & Tenders Portal |
URL |
More Details
Record type | Project |
Sector | Power Transmission, Bridge, Power Generation (CCGT), Education, Advanced Electronics, Government, Solar |
Article published date | 2025-10-01 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Power Transmission projects in Germany
- Albatros Offshore Wind Farm North Sea Germany
- Hohe See Offshore Wind Farm North Sea Germany
- EnBW Baltic 2 Offshore Wind Farm
- Herdecke 400MW CCGT GasFired Power Plant Grenada
- Westfalen Power Plant Units D and E Hamm
- Vetter Pharma-Fertigung, Contract Manufacturing Facility, Ravensburg
- iC4 (Integrated Carbon Capture, Conversion and Cycling)
- FReSME