logo

Towards the sustainable giga-factory: developing green cell manufacturing processes

Sector: Energy Storage • Location: Italy, Spain, Belgium, France, Germany, Norway, Portugal

Source: EU Funding & Tenders Portal

Project
Ongoing

The EU has established an ambitious industrial goal to make Europe a strategic global leader in the Li-ion battery value chain, deploying a sustainable and innovative industry. This urges the sector to make sure that the industrial production is inherently sustainable, safe, flexible and cost-effective while delivering cutting edge cells. The main objective of GIGAGREEN is to boost the next wave o

Project Information FAQ

Project Information

4 Q
The project “Towards the sustainable giga-factory: developing green cell manufacturing processes” is an infrastructure initiative in the Energy Storage sector, located in Italy, Spain, Belgium, France, Germany, Norway, Portugal. Taiyo aggregates data on it from EU Funding & Tenders Portal.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

ongoing

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The EU has established an ambitious industrial goal to make Europe a strategic global leader in the Li-ion battery value chain, deploying a sustainable and innovative industry. This urges the sector to make sure that the industrial production is inherently sustainable, safe, flexible and cost-effective while delivering cutting edge cells. The main objective of GIGAGREEN is to boost the next wave of electrode and cell component processing techniques, enabling breakthrough innovations to improve the environmental, economic and social performance of generation 3b Li-ion cells manufacturing industry, thus positioning Europe at the forefront of the global market. GIGAGREEN proposes a structured research plan to develop and scale up (TRL 3-4 to 5-6) novel electrode and cell component manufacturing processes that follow a Design to Manufacture (DtM) approach. This is, seeking for the minimum environmental impact and energy consumption, cell designs which facilitate the re-use and disassembly, increasement of the cost-efficiency and safety of processes and products, and high-throughput technologies able to be easily scaled up and automated in the context of industry 4.0/5.0 giga-factories. Supported by a vibrant and experienced consortium of academic and industrial partners, GIGAGREEN will follow two alternative R&I trajectories. The first one, based on N-Methyl-2-pyrrolidone (NMP)-free wet processing, is designed for a quick scale up and market uptake of optimised wet coating systems in current industrial setups (final TRL6, 30 cells of 10 Ah prototyped as demonstration). The second one, based on dry processing, will explore breakthrough technologies, achieving a smaller TRL by the end of the project (final TRL5, 30-40 mAh monolayer pouch cells prototypes as proof of concept), paving the path for upcoming R&I experiences to continue scaling up the most promising dry processing techniques.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data