Tower - Mixed Use
Sector: Solar • Location: Cedar Rapids, Iowa, United States of America
Source: Dodge USA
Emerson s unnamed project would include a ground level, full-service grocery store, a 17th-floor restaurant with patio, 100 to 120 condominiums, 21 apartments, office space, possibly a medical clinic, balconies and about 700 parking spaces. Green design is a focus with rooftop gardens, rooftop solar - electric vehicle charging stations, bike storage and solar panels -There would be a mini dog park
- Status
- Failure
- Sector
- Solar, Hospital, Manufacturing (Industrial), Residential, Automotive, Bridge, Commercial, Electric Vehicles (EVs), Hotel, Power Generation (CCGT), Car parking, Consumer Products
- Location
- Cedar Rapids, Iowa, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Tower - Mixed Use
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Delayed |
Taiyo status | Failure |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Emerson s unnamed project would include a ground level, full-service grocery store, a 17th-floor restaurant with patio, 100 to 120 condominiums, 21 apartments, office space, possibly a medical clinic, balconies and about 700 parking spaces. Green design is a focus with rooftop gardens, rooftop solar - electric vehicle charging stations, bike storage and solar panels -There would be a mini dog park on theupper levels - A chain called Brothers Market (owned by Jared, Jay and Darian DeVries) wou... |
Budget |
Location
Country | United States of America (USA) |
State | Iowa |
City | Cedar Rapids |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Solar, Hospital, Manufacturing (Industrial), Residential, Automotive, Bridge, Commercial, Electric Vehicles (EVs), Hotel, Power Generation (CCGT), Car parking, Consumer Products |
Article published date | 2024-11-18 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Solar projects in United States of America
- I-85 @ SR 1/US 27 - SOLAR PANEL FARM - TRACKING ONLY
- INSTALL ROOF MOUNTED PV SYSTEM 10 MODULES 2.6 KW
- INSTALL ROOF MOUNTED SOLAR PV SYSTEM 8.69 KW 22 PANELS
- PV SOLAR ROOF MOUNT SYSTEM 4.80 KW WIHT 12 MODULES
- AS PER MASTER PV PERMIT 202103084 SOHAY LINE BUILDING 16 UNIT 206 (7) MODULE 2.45 KW SYSTEM
- 8.19 KW ROOF MOUNT SOLAR INSTALL WITH (18) 455W MODULES AND (9) AP SYSTEM DS3-L MICROINVERTERS.
- INSTALL 4.4 KW PV ARRAY WITH (11) 400W MODULES.
- ROOF MOUNT SOLAR: (11) 400W MODULES AT 4.4 KW TOTAL
