logo
ProjectPlanning Schematics

Tower Road Bridge Replacement

The status, timeline and source of this project. A free account opens every field.

Source: Dodge USA

Replacement of a temporary pre-engineered steel bridge along Tower Road located near Rock Creek, at Tower Road milepost 4.52 to allow for a more natural flow of traffic. The project will include the removal of a temporary bridge, construction and removal of a temporary stream diversion, regrading of quarry spalls, removal of existing concrete culvert, channel excavation, relocation of franchise ut

Status
Prospective
Sector
Government, Steel, Cement, Power Transmission, Bridge, Commercial, Road, Power Generation (CCGT), Metal
Location
Washington, United States of America
Updated
19 Nov 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about Tower Road Bridge Replacement

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Tower Road Bridge Replacement” is an infrastructure initiative in the Government sector, located in Washington, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

Planning Schematics

Taiyo status

Prospective

Taiyo last update

2026-11-19

Contact

Not available for this record.

Description

Description

Replacement of a temporary pre-engineered steel bridge along Tower Road located near Rock Creek, at Tower Road milepost 4.52 to allow for a more natural flow of traffic. The project will include the removal of a temporary bridge, construction and removal of a temporary stream diversion, regrading of quarry spalls, removal of existing concrete culvert, channel excavation, relocation of franchise utilities, and construction of a permanent bridge.

Procurement method

Budget

Location

Country

United States of America (USA)

State

Washington

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Government, Steel, Cement, Power Transmission, Bridge, Commercial, Road, Power Generation (CCGT), Metal

Article published date

2024-12-30

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project