Tower Solar Project
Sector: Solar • Location: Oregon, United States
Source: Iberdrola
The Tower Solar project is a solar power facility with a capacity of 166 MWdc (120 MWac) located in Morrow County, Oregon. It involves the installation of more than 200,000 solar modules assembled at SEG Solar's new plant in Houston, Texas. The project will supply power to Portland General Electric's grid and support Meta's data centre operations in the region.
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | under construction |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The Tower Solar project is a solar power facility with a capacity of 166 MWdc (120 MWac) located in Morrow County, Oregon. It involves the installation of more than 200,000 solar modules assembled at SEG Solar's new plant in Houston, Texas. The project will supply power to Portland General Electric's grid and support Meta's data centre operations in the region. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
More Solar projects in United States
- Morphotek’s New Biologics Production Facility
- Lilly Institute for Genetic Medicine, Boston, Massachusetts, USA
- Sartorius’ Biopharmaceutical Manufacturing Facility Expansion, Puerto Rico
- Arranta’s New Commercial-Ready Manufacturing Facility, Watertown, Massachusetts
- Spaceport America, New Mexico
- Centrally Managed Pay-and-Display Parking
- Biodiesel from Algae, A Facility to Produce Biodiesel from Algae Oil, USA
- Kona Brewing’s Brewery and Canning Facility, Hawaii, US
