logo
ProjectUnder Construction

Tower Solar Project

Sector: Data Center • Location: Boardman, Oregon, United States

Source: SolarQuarter

The Tower Solar project is a 166 MWdc (120 MWac) solar power project located in Morrow County, Oregon. It involves the installation of more than 250,000 American-made solar panels manufactured and assembled by SEG Solar in Houston. The project will supply clean electricity to the Portland General Electric grid and support a new QTS data center campus in the region. The project aims to add renewabl

Status
Under Construction
Sector
Data Center, Power Generation (CCGT), Power Transmission, Solar
Location
Boardman, Oregon, United States of America
Updated
22 Jul 2026
Source
SolarQuarter

ConstructChat

Ask ConstructChat about Tower Solar Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Tower Solar Project” is an infrastructure initiative in the Data Center sector, located in Boardman, Oregon, United States. Taiyo aggregates data on it from SolarQuarter.

Participants

Not available for this record.

Status

Original status

under construction

Taiyo status

Under Construction

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Tower Solar project is a 166 MWdc (120 MWac) solar power project located in Morrow County, Oregon. It involves the installation of more than 250,000 American-made solar panels manufactured and assembled by SEG Solar in Houston. The project will supply clean electricity to the Portland General Electric grid and support a new QTS data center campus in the region. The project aims to add renewable power to the region, support local jobs, and contribute to local public services through property taxes and payments in lieu of taxes.

Original sector

Energy

Budget

Location

Country

United States of America (USA)

State

Oregon

City

Boardman

Source

Source

SolarQuarter

URL

More Details

Record type

Project

Sector

Data Center, Power Generation (CCGT), Power Transmission, Solar

Article published date

2026-04-04

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project