logo

Town Center Improvements Phase 3

Sector: Government • Location: Snoqualmie, Washington, United States of America

Source: Dodge USA

Project
Closed

The intent of this project is to reconstruct portions of State Route 202 (Railroad Avenue) between Northern Street and the State Route 202 Bridge, upgrade the adjacent multi-use path, replace and relocate utilities, as well as add street lighting, streetscape improvements, traffic calming measures, trail and transit connections, and natural landscaping elements. A new pedestrian bridge and gateway

Status
Closed
Sector
Government, Power Transmission, Power Generation (CCGT), Bridge, Rail, Road, Commercial
Location
Snoqualmie, Washington, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about Town Center Improvements Phase 3

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Town Center Improvements Phase 3” is an infrastructure initiative in the Government sector, located in Snoqualmie, Washington, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The intent of this project is to reconstruct portions of State Route 202 (Railroad Avenue) between Northern Street and the State Route 202 Bridge, upgrade the adjacent multi-use path, replace and relocate utilities, as well as add street lighting, streetscape improvements, traffic calming measures, trail and transit connections, and natural landscaping elements. A new pedestrian bridge and gateway features will be addressed through community outreach efforts.

Procurement method

Budget

Location

Country

United States of America (USA)

State

Washington

City

Snoqualmie

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Government, Power Transmission, Power Generation (CCGT), Bridge, Rail, Road, Commercial

Article published date

2024-10-14

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project