logo

Town House in Linz / mia2/Architektur

Sector: Forest Products and Packaging • Location: Linz

Source: ArchDaily

Project
Closed

As an in-house project, this construction project has always been an experimental object for us for innovative renovation methods and special solutions. For example, the CLAY from the excavation on the ground floor was processed into rammed earth walls and these are now being used as prefabricated load-bearing parts when the story is added.In order to enable a gentle renovation of the existing bui

Project Information FAQ

Project Information

3 Q
The project “Town House in Linz / mia2/Architektur” is an infrastructure initiative in the Forest Products and Packaging sector, located in Linz. Taiyo aggregates data on it from ArchDaily.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

As an in-house project, this construction project has always been an experimental object for us for innovative renovation methods and special solutions. For example, the CLAY from the excavation on the ground floor was processed into rammed earth walls and these are now being used as prefabricated load-bearing parts when the story is added.In order to enable a gentle renovation of the existing building without major interventions, during the process of changing the development plan regarding the new story number, the position of a new entrance with a connection core, staircase and lift has been also defined. In this way, the characteristics of the historical substance could be preserved in the best possible way. The addition is carried out according to ecological, economic, and structural requirements in mixed construction - mostly timber construction.In addition to all these ecological, economic, and formal considerations, the social and community idea was also important to us. In addition to a LIVELY and LIVABLE townhouse with communicative balconies and courtyard areas, we also took our responsibility as a neighbor and counterpart seriously.Using wood-concrete composite technology, the several hundred-year-old wooden ceilings could be preserved and strengthened in terms of statics and building physics. A five-story spiral staircase was built from specially developed precast concrete elements.RAILINGS that were disposed of during another construction project have been re-adapted and are now finding new uses in our balcony shelf. The wood addition shows up on the street side with a mullion and transom facade that covers several needs, such as fall protection, the fire barrier function, and the structure.The free-standing staircase is wrapped in a metal net, which is to be overgrown with kiwi and vine tendrils over the next few years. In order to counteract the sealing in the best possible way, we have provided the roofs of the courtyard buildings with a green roof and the areas in the courtyard have been made robustly playable with water-permeable GRP grids.Balconies on the south facade and garden on the ground floor enable communication and the meeting area for workers of the office and inhabitants of the building. The street side should be just as friendly, with a ground floor that people like to walk along. Our small bench in front of the main facade is used to rest - we are very happy about that!Text description provided by the architects.The Town House is located in the central street Lederergasse - a livable, quiet street that connects Linz's main square, via the tobacco factory, with the port. The existing building – its primary substance from the 16th century – has been renovated and expanded. Over a process lasting several years, first, the premises on the ground floor were converted into the company's own architect's office. The apartments on the 1st and 2nd floor were cleared out and renovated down to their constructive structures. In the last two years, the inventory has been supplemented with an addition.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data