logo

Town of Antigonish Active Transportation Spine

Sector: Bridge • Location: Nova Scotia, Canada

Source: Infrastructure Canada

Project
In Progress

Through this project, the Town of Antigonish will create an active transportation corridor that will act as the spine of the active transportation network for the Town of Antigonish and connect to a greater active transportation network in the surrounding County of Antigonish. The project involves a series of active transportation infrastructure pieces that connect to form two kilometres of active

Status
Under Construction
Sector
Bridge, Car parking, Road, Government, Automotive
Location
Nova Scotia, Canada
Updated
22 Jul 2026
Source
Infrastructure Canada

ConstructChat

Ask ConstructChat about Town of Antigonish Active Transportation Spine

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Town of Antigonish Active Transportation Spine” is an infrastructure initiative in the Bridge sector, located in Nova Scotia, Canada. Taiyo aggregates data on it from Infrastructure Canada.

Participants

Sponsoring Agency

Status

Original status

in progress

Taiyo status

Under Construction

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Through this project, the Town of Antigonish will create an active transportation corridor that will act as the spine of the active transportation network for the Town of Antigonish and connect to a greater active transportation network in the surrounding County of Antigonish. The project involves a series of active transportation infrastructure pieces that connect to form two kilometres of active transportation spine; the project locations and type of facilities will be built to meet all ages and abilities standards. The projects are all considered reconstruction on developed land (aside from the 2 bridges) and include: Location Section A: West Street (connecting Highway 104 and James Street to St. Ninian Street) Facilities in this location will include an asphalt multi-use pathway (235m) and a raised bi-directional bicycle facility (400m) separated from vehicular traffic using pre-cast curbs. Location Section B: St. Ninian Street (connecting West Street to Church Street) Facilities in this location will include a multi-use pathway (180m), and a raised bi-directional bicycle facility with shared sidewalk (525m) separated from vehicular traffic using pre-cast curbs. Location Section C: Off-road section through Columbus Field (connecting Church Street to St. Andrews Street) Facilities in this location will include a multi-use pathway (825m) and active transportation bridge (40m). Location Section D: Main Street (connecting St. Andrew Street to Adam Street) Facilities in this location will include a multi-use pathway (55m), shared sidewalk (70m) and an active transportation bridge (50m) which connects with existing AT infrastructure in the town.

Original sector

Active Transportation

Location

Country

Canada

State

Nova Scotia

Source

Source

Infrastructure Canada

URL

More Details

Record type

Project

Sector

Bridge, Car parking, Road, Government, Automotive

Article published date

2026-01-18

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project