logo

Town of Battleford - North Saskatchewan River Truss Bridges

Sector: Cement • Location: Saskatchewan, Canada

Source: Infrastructure Canada

Project
Completed

The north pedestrian bridge has eroded over time. Bank restoration and concrete matting as well as sheet pile walls were explored as options to address the slope instability. The engineering solutions will be revisited and revised as needed to suit the current level of erosion and subsequently implemented for construction for the 2020/2021 season. The work for the project will include: -Bank rest

Status
Closed
Sector
Cement, Steel, Bridge, Metal, Government
Location
Saskatchewan, Canada
Updated
22 Jul 2026
Source
Infrastructure Canada

ConstructChat

Ask ConstructChat about Town of Battleford - North Saskatchewan River Truss Bridges

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Town of Battleford - North Saskatchewan River Truss Bridges” is an infrastructure initiative in the Cement sector, located in Saskatchewan, Canada. Taiyo aggregates data on it from Infrastructure Canada.

Participants

Sponsoring Agency

Status

Original status

completed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The north pedestrian bridge has eroded over time. Bank restoration and concrete matting as well as sheet pile walls were explored as options to address the slope instability. The engineering solutions will be revisited and revised as needed to suit the current level of erosion and subsequently implemented for construction for the 2020/2021 season. The work for the project will include: -Bank restoration and armouring (concrete matting) of the north bank of Finlayson Island; -Replacement of the south jump span with a longer span to move the foundations further away from the extents of the North Saskatchewan River; -Replacement of expansion joints; -Replacing deteriorated concrete on piers. -Removal of decommissioned gas line and corroded supports; and -Steel truss member upgrades with new plates and bolting.

Original sector

Active Transportation

Budget

Location

Country

Canada

State

Saskatchewan

Source

Source

Infrastructure Canada

URL

More Details

Record type

Project

Sector

Cement, Steel, Bridge, Metal, Government

Article published date

2025-06-04

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project