logo

Town of Birch Hills - Lagoon Expansion Project

Sector: Water Supply and Storage • Location: Saskatchewan, Canada

Source: Infrastructure Canada

Project
Pre-Construction

The Lagoon Expansion Project for Birch Hills will involve the current secondary storage cell being expanded. The upgrades will include: an additional secondary cell; new control structures; twinning of current effluent pipe. With the water treatment plant upgrades and planning for residential and commercial/industrial development, the lagoon system will not be able to meet WSA and provincial/feder

Status
Prospective
Sector
Water Supply and Storage, Manufacturing (Industrial), Commercial, Residential, Government
Location
Saskatchewan, Canada
Updated
22 Jul 2026
Source
Infrastructure Canada

ConstructChat

Ask ConstructChat about Town of Birch Hills - Lagoon Expansion Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Town of Birch Hills - Lagoon Expansion Project” is an infrastructure initiative in the Water Supply and Storage sector, located in Saskatchewan, Canada. Taiyo aggregates data on it from Infrastructure Canada.

Participants

Sponsoring Agency

Status

Original status

pre-construction

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Lagoon Expansion Project for Birch Hills will involve the current secondary storage cell being expanded. The upgrades will include: an additional secondary cell; new control structures; twinning of current effluent pipe. With the water treatment plant upgrades and planning for residential and commercial/industrial development, the lagoon system will not be able to meet WSA and provincial/federal regulations due to capacity. The new lagoon cell will result in both primary and secondary cells having adequate treatment capacity under the new regulations and projected wastewater flow rates. The new cell will be constructed to current regulations. The outcome will be increased storage capacity to meet 20-year projected wastewater rates with a new RO treatment system, update the lagoon treatment capacity to suit current WSA regulations, matching the design capacity of the primary and secondary cells, and increased effluent discharge capacity to meet WSA regulations for discharge periods.

Original sector

Drinking Water and Wastewater

Budget

Location

Country

Canada

State

Saskatchewan

Source

Source

Infrastructure Canada

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Manufacturing (Industrial), Commercial, Residential, Government

Article published date

2025-06-04

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project