Town of Brunswick Bike Path Paving
Sector: Manufacturing (Industrial) • Location: Brunswick, Maine, United States of America
Source: Dodge USA
Paving the Bike Path - 2.6 miles 2.6 miles rounded up = 15,000 feet 14 feet wide 2 inches thick Hot mix tons required = 2,625 2,625 x $200 (based on $100 materials + $100 installation) = $525,000 Time escalator - use $600,000
- Status
- Prospective
- Sector
- Manufacturing (Industrial), Commercial, Car parking, Government, Automotive
- Location
- Brunswick, Maine, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Town of Brunswick Bike Path Paving
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Pre-Design |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Paving the Bike Path - 2.6 miles http://www.amerasphalt.com/asphalt.htm 2.6 miles rounded up = 15,000 feet 14 feet wide 2 inches thick Hot mix tons required = 2,625 2,625 x $200 (based on $100 materials + $100 installation) = $525,000 Time escalator - use $600,000 |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Maine |
City | Brunswick |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Manufacturing (Industrial), Commercial, Car parking, Government, Automotive |
Article published date | 2024-10-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Manufacturing (Industrial) projects in United States of America
- CR 275/RIVER ROAD FROM SR 65 TO CR 11/SLASH ROAD
- SOUTH VALDOSTA TRUCK BYPASS
- CR 92/WRIGHTS MILL ROAD @ HUDSON RIVER 7.3 MI SE OF HOMER
- BRIDGE PRESERVATION @ 7 LOCS IN CLARKE & WALTON COUNTY
- LINCOLNTON DOWNTOWN STREETSCAPE - PHASE II
- CR 526/OLD MACON RD FM EVERGREEN RD TO WILKINSON COUNTY LINE
- SR 7/US 341 @ SR 74
- ASHFORD-DUNWOODY ROAD EB RAMP @ I-285
