logo

Town of Burstall - Landfill Decommissioning

Sector: Cement • Location: Saskatchewan, Canada

Source: Infrastructure Canada

Project
In Progress

The project objective is to decommission and reclaim the landfill of the Town of Burstall, with the best management practices for landfill construction. This landfill site has a surface area of 9.14 hectrares and was permitted to only receive municipal waste during its operation. Our landfill site is currently in operation and is used as a transfer station. The Environmental Site Assessment Level

Project Information FAQ

Project Information

5 Q
The project “Town of Burstall - Landfill Decommissioning” is an infrastructure initiative in the Cement sector, located in Saskatchewan, Canada. Taiyo aggregates data on it from Infrastructure Canada.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

in progress

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The project objective is to decommission and reclaim the landfill of the Town of Burstall, with the best management practices for landfill construction. This landfill site has a surface area of 9.14 hectrares and was permitted to only receive municipal waste during its operation. Our landfill site is currently in operation and is used as a transfer station. The Environmental Site Assessment Level II and the Corrective Action Plan have not been completed; and are included as part of the scope of the project. Decommissioning and Reclamation activities include the design and construction of the final engineered cover, storm water management, recycling, metal, concrete, clean wood piles, installation of monitoring wells, and reclamation activities to ensure it is in conformance with the surrounding lands and the future intended use. The landfill site has been converted to a transfer station where bins are only used. The reclaimed landfill will be owned by the Town of Burstall, which at this time has not future plans. Decommissioning and reclamation of the proposed landfill site will attenuate the generation of leachate which in turn increases capacity to reduce soil pollutants in line with the Environmental Quality Outcomes of the Green Infrastructure Stream of the ICIP.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data