Town of Carbonado ELK Loop Overlay
Sector: Water Supply and Storage • Location: Carbonado, Washington, United States of America
Source: Dodge
Approximately 900 LE of pavement overlay will be constructed on Elk Loop between its connections to Sth Street NW. The Base Bid includes pavement repair excavation, hot mix asphalt paving, gravel shoulders, utility casting adjustments, monument replacement, pavement striping and traffic control. The Additive Schedule includes catch basins, storm pipe and infiltration pipe.
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | closed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | Approximately 900 LE of pavement overlay will be constructed on Elk Loop between its connections to Sth Street NW. The Base Bid includes pavement repair excavation, hot mix asphalt paving, gravel shoulders, utility casting adjustments, monument replacement, pavement striping and traffic control. The Additive Schedule includes catch basins, storm pipe and infiltration pipe. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
