Town of Fort Qu’Appelle Water Treatment Plant Improvements
One of 10,000+ projects Taiyo tracks in Saskatchewan.
Source: Infrastructure Canada
The Town of Fort Qu’Appelle, located in Treaty 4 territory, operates their Water Treatment Plant (WTP) to meet the needs of the residents (of which over a third are of Indigenous or First Nations heritage) and businesses of the Town of Fort Qu’Appelle (population of 1,972) as well as the All Nations Healing Hospital (owned and operated by the File Hills Tribal Council and the Touchwood Agency Trib
- Status
- Under Construction
- Sector
- Water Supply and Storage, Hospital, Government
- Location
- Saskatchewan, Canada
- Updated
- 22 Jul 2026
- Source
- Infrastructure Canada
ConstructChat
Ask ConstructChat about Town of Fort Qu’Appelle Water Treatment Plant Improvements
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | in progress |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Town of Fort Qu’Appelle, located in Treaty 4 territory, operates their Water Treatment Plant (WTP) to meet the needs of the residents (of which over a third are of Indigenous or First Nations heritage) and businesses of the Town of Fort Qu’Appelle (population of 1,972) as well as the All Nations Healing Hospital (owned and operated by the File Hills Tribal Council and the Touchwood Agency Tribal Council). The facility is over 32 years old and many systems are requiring replacement or upgrades. The Town has been proactive in assessing the conditions and required work, and this scope includes the replacement of antiquated electrical and controls, a new backup generator, sustainability improvements, safety improvements for air quality, and public health protection by removing drinking water contamination risks. The Town has started the design of the improvements before the grant was open, and will utilize this momentum to achieve a quick construction period for this shovel ready project. |
Original sector | Drinking Water and Wastewater |
Location
Country | Canada |
State | Saskatchewan |
Source
Source | Infrastructure Canada |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Hospital, Government |
Article published date | 2025-10-05 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
