Town of Gravelbourg-Landfill Decommissioning
Sector: Cement • Location: Saskatchewan, Canada
Source: Infrastructure Canada
The project objective is to decommission and reclaim the landfill. The Town of Gravelbourg, non-compliant with the best management practices for landfill construction. The Landfill is located at NE01-Twp11-Rge05-W3M and has a surface area of 2.48 hectares (Parcel # 104520451) and was permitted to only receive municipal waste during its operation. The Landfill is currently in operation and will be
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | in progress |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The project objective is to decommission and reclaim the landfill. The Town of Gravelbourg, non-compliant with the best management practices for landfill construction. The Landfill is located at NE01-Twp11-Rge05-W3M and has a surface area of 2.48 hectares (Parcel # 104520451) and was permitted to only receive municipal waste during its operation. The Landfill is currently in operation and will be closed prior to decommissioning activities. Environmental Site Assessment Level II, Risk Assessment and Feasibility Study have been completed. There is a ground water monitoring program in place; therefore, the scope of the project includes the CAP that has not been completed, as well as, completing and implementing a Decommissioning and Reclamation plan that is acceptable to the Ministry of Environment’s Landfill Section. Decommissioning and Reclamation activities include the design and construction of the final engineered cover, storm water management, removal of existing infrastructure, recycling, metal, concrete, clean wood piles, installation of monitoring wells, and reclamation activities to ensure it is in conformance with the surrounding lands and the future intended use. The landfill will be converted to a transfer station where containers and/or bins will only be used. The reclaimed landfill will be owned by The Town of Gravelbourg with the intended use of a secured location for a future Transfer Station. Decommissioning and reclamation of the proposed landfill will attenuate the generation of leachate which in turn increases capacity to reduce soil pollutants in line with the Environmental Quality Outcomes of the Green Infrastructure Stream of the Investing in Canada Infrastructure Program. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
