logo

Town of Kentville - Donald E. Hiltz Connector Road - Water, Storm & Sanitary Infrastructure

Sector: Water Supply and Storage • Location: Nova Scotia, Canada

Source: Infrastructure Canada

Project
Pre-Construction

This project is to install linear infrastructure under the future Donald E. Hiltz Connector Road. It is located in a parcel of land owned by the Town of Kentville which once complete will connect the Kentville Business Park to Prospect Avenue, providing a much-needed alternate route for the Town and providing access to developable land on both sides of the corridor. The scope of this ICIP project

Project Information FAQ

Project Information

4 Q
The project “Town of Kentville - Donald E. Hiltz Connector Road - Water, Storm & Sanitary Infrastructure” is an infrastructure initiative in the Water Supply and Storage sector, located in Nova Scotia, Canada. Taiyo aggregates data on it from Infrastructure Canada.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

pre-construction

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

This project is to install linear infrastructure under the future Donald E. Hiltz Connector Road. It is located in a parcel of land owned by the Town of Kentville which once complete will connect the Kentville Business Park to Prospect Avenue, providing a much-needed alternate route for the Town and providing access to developable land on both sides of the corridor. The scope of this ICIP project is for Phase 1 of this overall project. Phase 1 is the construction of water distribution pipes, sanitary sewer collection pipes, and a stormwater management system in the Donald E. Hiltx Connector Road corridor. Also included in Phase 1 is the replacement of an end-of-life water tank and treatment plant with a modern water storage tank/plant at the same elevation as the current tank on Prospect Avenue greatly increasing the operational flexibility and reliability of service. Phase 1 of Donald E. Hiltz Connector Road - Water, Storm & Sanitary Infrastructure project will increase capacity to treat and manage wastewaster and stormwater and increase access to potable water.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data