Town of Kinistino - Landfill Decommission
In progress · Saskatchewan
Source: Infrastructure Canada
The project objective is to decommission and reclaim the landfill of The Town of Kinistino, non-compliant with the best management practices for landfill construction. The Landfill cells have a surface area of 2.5 hectares and was permitted to only receive municipal waste during its operation. The Landfill is currently closed and ready for decommissioning. The scope of the project includes having
- Status
- Under Construction
- Sector
- Water Supply and Storage, Government, Waste Processing and Treatment
- Location
- Saskatchewan, Canada
- Updated
- 22 Jul 2026
- Source
- Infrastructure Canada
ConstructChat
Ask ConstructChat about Town of Kinistino - Landfill Decommission
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | in progress |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project objective is to decommission and reclaim the landfill of The Town of Kinistino, non-compliant with the best management practices for landfill construction. The Landfill cells have a surface area of 2.5 hectares and was permitted to only receive municipal waste during its operation. The Landfill is currently closed and ready for decommissioning. The scope of the project includes having the Environmental Site Assessment Level II and the Corrective Action Plan completed, completing and implementing a Decommissioning and Reclamation plan that is acceptable to the Ministry of Environment’s Landfill Section. Decommissioning and Reclamation activities include the design and construction of the final engineered cover, storm water management, if required the installation of monitoring wells, and reclamation activities to ensure it is in conformance with the surrounding lands and the future intended use. The Landfill site will be converted to a station where bins will be used. We will continue to have an area for clean wood piles. Reclaimed landfill will be owned by The Town of Kinistino with the intended use of native pastureland. Decommissioning and reclamation of the proposed landfill will attenuate the generation of leachate which in turn increases capacity to reduce soil pollutants in line with the Environmental Quality Outcomes of the Green Infrastructure Stream of the Investing in Canada Infrastructure Program. |
Original sector | Waste Management |
Location
Country | Canada |
State | Saskatchewan |
Source
Source | Infrastructure Canada |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Government, Waste Processing and Treatment |
Article published date | 2026-03-01 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
