Town of Maidstone Water Supply Expansion Project
One of 10,000+ projects Taiyo tracks in Saskatchewan.
Source: Infrastructure Canada
The objective of this project is to increase access to potable water by doubling available supply and expanding maximum system capacity. The scope involves the drilling and connection of a new well including all electrical and structural improvements. The output of this project is a second water well which will secure supply and increase maximum system capacity from 10.87 liters per second to 13.1
- Status
- Under Construction
- Sector
- Water Supply and Storage
- Location
- Saskatchewan, Canada
- Updated
- 22 Jul 2026
- Source
- Infrastructure Canada
ConstructChat
Ask ConstructChat about Town of Maidstone Water Supply Expansion Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | in progress |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The objective of this project is to increase access to potable water by doubling available supply and expanding maximum system capacity. The scope involves the drilling and connection of a new well including all electrical and structural improvements. The output of this project is a second water well which will secure supply and increase maximum system capacity from 10.87 liters per second to 13.13 liters per second. |
Original sector | Drinking Water and Wastewater |
Location
Country | Canada |
State | Saskatchewan |
Source
Source | Infrastructure Canada |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage |
Article published date | 2026-05-31 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
