Town of Milestone - Landfill Decommissioning
Sector: Water Supply and Storage • Location: Saskatchewan, Canada
Source: Infrastructure Canada
The project objective is to decommission and reclaim the landfill of the Town of Milestone, which is non-compliant with the best management practices for landfill construction. The landfill has a surface area of 4 hectares and was permitted to receive only municipal waste during its operation. The landfill is currently in operation and will be closed prior to decommissioning activities. The Enviro
- Status
- Under Construction
- Sector
- Water Supply and Storage, Cement, Waste Processing and Treatment, Metal, Government
- Location
- Saskatchewan, Canada
- Updated
- 22 Jul 2026
- Source
- Infrastructure Canada
ConstructChat
Ask ConstructChat about Town of Milestone - Landfill Decommissioning
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | in progress |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project objective is to decommission and reclaim the landfill of the Town of Milestone, which is non-compliant with the best management practices for landfill construction. The landfill has a surface area of 4 hectares and was permitted to receive only municipal waste during its operation. The landfill is currently in operation and will be closed prior to decommissioning activities. The Environmental Site Assessment Level II and the Corrective Action Plan have been already completed; therefore, the scope of the project includes completing and implementing a decommissioning and reclamation plan that is acceptable to the Ministry of Environment’s Landfill Section. Decommissioning and reclamation activities include the design and construction of the final engineered cover, storm water management, removal of existing infrastructure, recycling, metal, concrete, clean wood piles, installation of monitoring wells, and reclamation activities to ensure it is in conformance with the surrounding lands and the future intended use. The landfill will be converted to a transfer station where only bins will be used. The reclaimed landfill will be owned by Town of Milestone with the intended use of a transfer station. Decommissioning and reclamation of the proposed landfill will attenuate the generation of leachate which in turn will increase the capacity to reduce soil pollutants in line with the Environmental Quality outcomes of the Green Infrastructure Stream of the Investing in Canada Infrastructure Program. |
Original sector | Waste Management |
Location
Country | Canada |
State | Saskatchewan |
Source
Source | Infrastructure Canada |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Cement, Waste Processing and Treatment, Metal, Government |
Article published date | 2026-02-01 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
