Town of Outlook Landfill Decommissioning

One of 10,000+ projects Taiyo tracks in Saskatchewan.

Source: Infrastructure Canada

Project
Completed

The Project proposes the decontamination and decommissioning of a 300 m x 375 m landfill site in Outlook Saskatchewan. There is currently no intended future land use once the site has been decontaminated. Due to the distance from the Town of Outlook and the proximity to the current landfill, no future development is anticipated. The scope of work for the Project includes an environmental assessmen

Status
Closed
Sector
Water Supply and Storage, Waste Processing and Treatment, Government
Location
Saskatchewan, Canada
Updated
22 Jul 2026
Source
Infrastructure Canada

ConstructChat

Ask ConstructChat about Town of Outlook Landfill Decommissioning

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Town of Outlook Landfill Decommissioning” is an infrastructure initiative in the Water Supply and Storage sector, located in Saskatchewan, Canada. Taiyo aggregates data on it from Infrastructure Canada.

Participants

Sponsoring Agency

Status

Original status

completed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Project proposes the decontamination and decommissioning of a 300 m x 375 m landfill site in Outlook Saskatchewan. There is currently no intended future land use once the site has been decontaminated. Due to the distance from the Town of Outlook and the proximity to the current landfill, no future development is anticipated. The scope of work for the Project includes an environmental assessment for the purpose of decommissioning, an evapotranspiration cover system (a cover that is placed over contaminated material, such as soil, landfill waste, or mining tailings to prevent water from getting in), and post closure monitoring (installation of ground monitoring wells). The evapotranspiration cover system consists of 0.85 m of local till overlaid by 0.15 m of topsoil (a layer of soil is used as a foundation for the waste and is the first layer of a landfill liner). The plant roots are then used to prevent contaminates from leaching into the environment; in this case the leachate plume. In the model that was produced during the preliminary design, this system resulted in a significant reduction in the amount of water anticipated to percolate through the waste zone. The Ultimate Recipient has confirmed that a Phase II Environmental Site Assessments (ESA) was completed as part of a requirement of the ongoing groundwater monitoring program from the Ministry of Environment. A Phase II ESA confirmed leachate plume is present. To better monitor the migration of the leachate plume and to ensure it does not pass the site boundary, additional monitoring wells were installed and are being monitored. All landfill decommissioning would increase capacity to “reduce” soil and air pollutants. All decommissioning projects increase capacity to reduce soil and air impacts by implementing proper capping of the landfill which will (1) immediately reduce and eventually stop leachate generation which has the potential to impact soil and water, and (2) reduce air emissions from decomposing waste and operating landfill equipment.

Original sector

Waste Management

Location

Country

Canada

State

Saskatchewan

Source

Source

Infrastructure Canada

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Waste Processing and Treatment, Government

Article published date

2026-02-01

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project