Town of Radville - Sewer Main Lining and Manhole Rehabilitation
One of 10,000+ projects Taiyo tracks in Saskatchewan.
Source: Infrastructure Canada
Project consists of relining sewer mains and manholes to reduce contamination of the soil & ensure the infrastructure can sustain heavy rainfalls, mitigating the collapse of roads from caverns caused by erosion (washouts of non-existing sewer lines from wear and extreme water flow) from heavy water/wastewater flow. The last time the Town of Radville experienced heavy rainfall a sewer line needed t
- Status
- Closed
- Sector
- Waste Processing and Treatment, Water Supply and Storage, Road
- Location
- Saskatchewan, Canada
- Updated
- 22 Jul 2026
- Source
- Infrastructure Canada
ConstructChat
Ask ConstructChat about Town of Radville - Sewer Main Lining and Manhole Rehabilitation
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | completed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Project consists of relining sewer mains and manholes to reduce contamination of the soil & ensure the infrastructure can sustain heavy rainfalls, mitigating the collapse of roads from caverns caused by erosion (washouts of non-existing sewer lines from wear and extreme water flow) from heavy water/wastewater flow. The last time the Town of Radville experienced heavy rainfall a sewer line needed to be replaced due to collapsing of the line and erosion of the soil under the ground. The Town of Radville needs to insert liners into approximately 2275 meters (7458 feet) of sewer mains and complete full rehabilitation of approximately 40 manholes throughout the community. Liners extend the life of the asset by 50 years. Placing liners in the sewer mains and manholes will ensure the integrity of the line and keep water and wastewater from escaping the designated path. Once the pipe is broke down or wore away from erosion, the water and waste water then begin eroding the dirt outside the lines. |
Original sector | Drinking Water and Wastewater |
Location
Country | Canada |
State | Saskatchewan |
Source
Source | Infrastructure Canada |
URL |
More Details
Record type | Project |
Sector | Waste Processing and Treatment, Water Supply and Storage, Road |
Article published date | 2026-05-31 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Waste Processing and Treatment projects in Canada
- Highway Rehab -- Bridge replacement Holland Drainage Canal, Bradford-West Gwillimbury
- Highway Rehab -- Resurfacing, Culvert rehabilitation, Drainage improvements Haldimand Rd. 56 to Dunnville west limits, and east limit of Dunnville to West/Central Boundary Haldimand County
- Highway Rehab -- Culvert rehabilitation Morris Drain Culvert, Lambton County
- Kirby In-Situ Oilsands Steam Assisted Gravity Drainage Buildings
- Southeast Personal Care Home
- Stonewall Woodlands Regional Water Supply
- Wastewater Lagoon Upgrades
- Russell Lagoon Upgrade
