Town of Rosetown - Rosetown Landfill Decommissioning
Sector: Waste Processing and Treatment • Location: Saskatchewan, Canada
Source: Infrastructure Canada
The main objective of this project is the decommissioning of the approximately 80,000 m2 landfill. Closure includes capping of the existing Waste Management Facility (WMF) cells. The Town has submitted their WMF Closure Plan to the Ministry of Environment and received approval of the plan on March 20, 2020. Closure of the facility is required to be completed following the expiration of their appro
- Status
- Under Construction
- Sector
- Waste Processing and Treatment, Government
- Location
- Saskatchewan, Canada
- Updated
- 22 Jul 2026
- Source
- Infrastructure Canada
ConstructChat
Ask ConstructChat about Town of Rosetown - Rosetown Landfill Decommissioning
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | in progress |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The main objective of this project is the decommissioning of the approximately 80,000 m2 landfill. Closure includes capping of the existing Waste Management Facility (WMF) cells. The Town has submitted their WMF Closure Plan to the Ministry of Environment and received approval of the plan on March 20, 2020. Closure of the facility is required to be completed following the expiration of their approval to operate as per requirements. The Town of Rosetown’s WMF was constructed in 1989 and has been in operation until the fall of 2018. The facility has reached its waste capacity. The Town made the decision to move to a Transfer station and close the current WMF. The Town has constructed a Transfer Station and is only accepting Construction and Demolition waste at the landfill site. Approval from The Saskatchewan Ministry of Environment for the operation of the landfill site accepting C&D materials only expires on September 30, 2021. |
Original sector | Waste Management |
Budget |
Location
Country | Canada |
State | Saskatchewan |
Source
Source | Infrastructure Canada |
URL |
More Details
Record type | Project |
Sector | Waste Processing and Treatment, Government |
Article published date | 2025-06-04 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Waste Processing and Treatment projects in Canada
- Highway Rehab -- Bridge replacement Holland Drainage Canal, Bradford-West Gwillimbury
- Highway Rehab -- Resurfacing, Culvert rehabilitation, Drainage improvements Haldimand Rd. 56 to Dunnville west limits, and east limit of Dunnville to West/Central Boundary Haldimand County
- Highway Rehab -- Culvert rehabilitation Morris Drain Culvert, Lambton County
- Kirby In-Situ Oilsands Steam Assisted Gravity Drainage Buildings
- Southeast Personal Care Home
- Stonewall Woodlands Regional Water Supply
- Wastewater Lagoon Upgrades
- Russell Lagoon Upgrade
