logo

Town of Tisdale Regional Landfill Expansion

The status, timeline and source of this project. A free account opens every field.

Source: Infrastructure Canada

Project
Completed

The Project proposes to expand an existing four hectare (ha) (2 ha landfill, 1 ha leachate pond [leachate is the liquid that drains or ’leaches’ from a landfill], and 1 ha compost area) regional landfill in order to accommodate additional communities, including the Town of Tisdale; the Villages of Bjorkdale, Valparaiso and Ridgedale; and the Rural Municipalities of Tisdale and Connaught. The expan

Status
Closed
Sector
Waste Processing and Treatment, Water Supply and Storage
Location
Saskatchewan, Canada
Updated
22 Jul 2026
Source
Infrastructure Canada

ConstructChat

Ask ConstructChat about Town of Tisdale Regional Landfill Expansion

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “Town of Tisdale Regional Landfill Expansion” is an infrastructure initiative in the Waste Processing and Treatment sector, located in Saskatchewan, Canada. Taiyo aggregates data on it from Infrastructure Canada.

Participants

Not available for this record.

Status

Original status

completed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Project proposes to expand an existing four hectare (ha) (2 ha landfill, 1 ha leachate pond [leachate is the liquid that drains or ’leaches’ from a landfill], and 1 ha compost area) regional landfill in order to accommodate additional communities, including the Town of Tisdale; the Villages of Bjorkdale, Valparaiso and Ridgedale; and the Rural Municipalities of Tisdale and Connaught. The expanded landfill will also service James Smith, Kinistin and Yellow Quill First Nations, and potentially the Red Earth First Nation. The scope of work for the Project includes the construction of a new cell, new leachate pond (where water that contains dissolved contaminants is collected and stored), a new compost pad, and engineering. The new compost area is being included in an effort to divert more waste from the landfill and increase the life of the asset. This Project is Phase 2 of the landfill cell that was constructed in 2018. Phase 1 began in summer 2018 with a cell that was built over the northern half of the landfill. The southern half, Phase 2, will be built in 2020 and will include the leachate evaporation cell. The full landfill cell design, has a natural divide, therefore this two-phased construction approach was readily achievable. A Phase 2 Environmental Site Assessment is currently underway, with a Corrective Action Plan (CAP) to follow.

Original sector

Waste Management

Location

Country

Canada

State

Saskatchewan

Source

Source

Infrastructure Canada

URL

More Details

Record type

Project

Sector

Waste Processing and Treatment, Water Supply and Storage

Article published date

2026-05-03

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project