Town of Tisdale Regional Landfill Expansion
The status, timeline and source of this project. A free account opens every field.
Source: Infrastructure Canada
The Project proposes to expand an existing four hectare (ha) (2 ha landfill, 1 ha leachate pond [leachate is the liquid that drains or ’leaches’ from a landfill], and 1 ha compost area) regional landfill in order to accommodate additional communities, including the Town of Tisdale; the Villages of Bjorkdale, Valparaiso and Ridgedale; and the Rural Municipalities of Tisdale and Connaught. The expan
- Status
- Closed
- Sector
- Waste Processing and Treatment, Water Supply and Storage
- Location
- Saskatchewan, Canada
- Updated
- 22 Jul 2026
- Source
- Infrastructure Canada
ConstructChat
Ask ConstructChat about Town of Tisdale Regional Landfill Expansion
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | completed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Project proposes to expand an existing four hectare (ha) (2 ha landfill, 1 ha leachate pond [leachate is the liquid that drains or ’leaches’ from a landfill], and 1 ha compost area) regional landfill in order to accommodate additional communities, including the Town of Tisdale; the Villages of Bjorkdale, Valparaiso and Ridgedale; and the Rural Municipalities of Tisdale and Connaught. The expanded landfill will also service James Smith, Kinistin and Yellow Quill First Nations, and potentially the Red Earth First Nation. The scope of work for the Project includes the construction of a new cell, new leachate pond (where water that contains dissolved contaminants is collected and stored), a new compost pad, and engineering. The new compost area is being included in an effort to divert more waste from the landfill and increase the life of the asset. This Project is Phase 2 of the landfill cell that was constructed in 2018. Phase 1 began in summer 2018 with a cell that was built over the northern half of the landfill. The southern half, Phase 2, will be built in 2020 and will include the leachate evaporation cell. The full landfill cell design, has a natural divide, therefore this two-phased construction approach was readily achievable. A Phase 2 Environmental Site Assessment is currently underway, with a Corrective Action Plan (CAP) to follow. |
Original sector | Waste Management |
Location
Country | Canada |
State | Saskatchewan |
Source
Source | Infrastructure Canada |
URL |
More Details
Record type | Project |
Sector | Waste Processing and Treatment, Water Supply and Storage |
Article published date | 2026-05-03 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Waste Processing and Treatment projects in Canada
- Highway Rehab -- Bridge replacement Holland Drainage Canal, Bradford-West Gwillimbury
- Highway Rehab -- Resurfacing, Culvert rehabilitation, Drainage improvements Haldimand Rd. 56 to Dunnville west limits, and east limit of Dunnville to West/Central Boundary Haldimand County
- Highway Rehab -- Culvert rehabilitation Morris Drain Culvert, Lambton County
- Kirby In-Situ Oilsands Steam Assisted Gravity Drainage Buildings
- Southeast Personal Care Home
- Stonewall Woodlands Regional Water Supply
- Wastewater Lagoon Upgrades
- Russell Lagoon Upgrade
