logo

Town of Tisdale Regional Landfill Expansion

Sector: Water Supply and Storage • Location: Saskatchewan, Canada

Source: Infrastructure Canada

Project
Completed

The Project proposes to expand an existing four hectare (ha) (2 ha landfill, 1 ha leachate pond [leachate is the liquid that drains or ’leaches’ from a landfill], and 1 ha compost area) regional landfill in order to accommodate additional communities, including the Town of Tisdale; the Villages of Bjorkdale, Valparaiso and Ridgedale; and the Rural Municipalities of Tisdale and Connaught. The expan

Project Information FAQ

Project Information

3 Q
The project “Town of Tisdale Regional Landfill Expansion” is an infrastructure initiative in the Water Supply and Storage sector, located in Saskatchewan, Canada. Taiyo aggregates data on it from Infrastructure Canada.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

completed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The Project proposes to expand an existing four hectare (ha) (2 ha landfill, 1 ha leachate pond [leachate is the liquid that drains or ’leaches’ from a landfill], and 1 ha compost area) regional landfill in order to accommodate additional communities, including the Town of Tisdale; the Villages of Bjorkdale, Valparaiso and Ridgedale; and the Rural Municipalities of Tisdale and Connaught. The expanded landfill will also service James Smith, Kinistin and Yellow Quill First Nations, and potentially the Red Earth First Nation. The scope of work for the Project includes the construction of a new cell, new leachate pond (where water that contains dissolved contaminants is collected and stored), a new compost pad, and engineering. The new compost area is being included in an effort to divert more waste from the landfill and increase the life of the asset. This Project is Phase 2 of the landfill cell that was constructed in 2018. Phase 1 began in summer 2018 with a cell that was built over the northern half of the landfill. The southern half, Phase 2, will be built in 2020 and will include the leachate evaporation cell. The full landfill cell design, has a natural divide, therefore this two-phased construction approach was readily achievable. A Phase 2 Environmental Site Assessment is currently underway, with a Corrective Action Plan (CAP) to follow.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data