logo

Town of Watson Lake - Construction Phase 1A - Water, Sewer, and Road Upgrades

Sector: Water Supply and Storage • Location: Yukon, Canada

Source: Infrastructure Canada

Project
In Progress

The sanitary collection system in the Town of Watson Lake is a combination of insulated and non-insulated sewer mains and forcemains. Historical records are incomplete but according to available drawings, the sanitary sewer infrastructure largely dates back to the 1970s and 1980s. Repairs of the sanitary sewer system occurred in 2012 where sections were replaced with PVC. The water system in the T

Project Information FAQ

Project Information

4 Q
The project “Town of Watson Lake - Construction Phase 1A - Water, Sewer, and Road Upgrades” is an infrastructure initiative in the Water Supply and Storage sector, located in Yukon, Canada. Taiyo aggregates data on it from Infrastructure Canada.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

in progress

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The sanitary collection system in the Town of Watson Lake is a combination of insulated and non-insulated sewer mains and forcemains. Historical records are incomplete but according to available drawings, the sanitary sewer infrastructure largely dates back to the 1970s and 1980s. Repairs of the sanitary sewer system occurred in 2012 where sections were replaced with PVC. The water system in the Town of Watson Lake is a combination of Asbestos Cement, Ductile Iron and PVC installed in the 1970s and 1980s, and is largely uninsulated with a minimum bury 3m below the surface. The road network is primarily surfaced with either gravel or BST. The storm system is a combination of ditches and culverts alongside the roads. Generally, there is a lack of ditches or storm drains within the Town which is causing the BST to deteriorate along the shoulders of the road and ponding at intersection and driveway locations. The BST is also in poor condition at intersection due to the vehicle turning movements. Infrastructure condition was assessed and replacement was ranked in order to continue to provide safe access to drinking water, adequate firefighting flows, and capacity to convey sewage. Roads condition was also assessed and roads in poor condition and those impacted by underground utility upgrades will be reconstructed as part of this project. Phase 1 includes replacement of 924 linear meters of sanitary line, 1128 linear meters of watermain, 13 manholes, 37 water services, 35 sewer services, and 2004 linear meters of road construction. Phase 1 is the first phase of a multiphase project. Future phases will be submitted as part of future funding requests.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data