logo

Town of Wolfville - Wastewater Treatment Facility Expansion Phase 1

Sector: Waste Processing and Treatment • Location: Nova Scotia, Canada

Source: Infrastructure Canada

Project
Completed

The project consists of the first phase of the expansion of the Town of Wolfville’s wastewater treatment facility. The scope of the work involves upgrading equipment within the facility. The project aims to improve the quality of the treated effluent and improvements to wastewater treatment facility. The Wolfville wastewater treatment lagoon was constructed in 1977. The lagoon construction includ

Project Information FAQ

Project Information

3 Q
The project “Town of Wolfville - Wastewater Treatment Facility Expansion Phase 1” is an infrastructure initiative in the Waste Processing and Treatment sector, located in Nova Scotia, Canada. Taiyo aggregates data on it from Infrastructure Canada.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

completed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The project consists of the first phase of the expansion of the Town of Wolfville’s wastewater treatment facility. The scope of the work involves upgrading equipment within the facility. The project aims to improve the quality of the treated effluent and improvements to wastewater treatment facility. The Wolfville wastewater treatment lagoon was constructed in 1977. The lagoon construction included a blower building and aeration system. The treatment system consists of two cells operated in series, each with a volume of approximately 20 410 m3. The wastewater treatment system is currently at or near capacity and therefore long term growth will require additional lagoon volume. The proposed lagoon expansion itself (future phase) will allow for future growth within the Town of Wolfville, and the adjacent community of Grand Pre. The proposed project is to upgrade the existing equipment within the treatment facility. The town will then monitor the facility performance for three years minimum and then design the next phase of the upgrade as required based on increased flows and the effluent discharge objectives. The first phase will enable the town to treat effluent better but not necessarily increase the total flows. The current average daily flow is just over 4,000 m3/day and the facility design capacity is 4,500 m3/day. The project will include the installation of ultraviolet (UV) effluent treatment to replace the antiquated chlorination system currently in place.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data