Townhomes
Design development · New Jersey · Last reported Oct 2024
Source: Dodge USA
Construction of 37 three-bedroom townhome units within 8 buildings. Block 113, Lots 1-5 and 11-27 (proposed lot 1.01 in block 113): o Lots proposed to be consolidated into new lot 1.01 (44,807 square feet/ 1.03 acres in size). o A total of seventeen (17) townhome units in four (4) buildings: Building A - 4 units; Building B - 7 units; Building C - 4 units; and Building D - 2 units Block 119, Lots
- Status
- Prospective
- Sector
- Manufacturing (Industrial), Residential, Commercial
- Location
- Franklin Township, New Jersey, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Townhomes
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Design Development |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Construction of 37 three-bedroom townhome units within 8 buildings. Block 113, Lots 1-5 and 11-27 (proposed lot 1.01 in block 113): o Lots proposed to be consolidated into new lot 1.01 (44,807 square feet/ 1.03 acres in size). o A total of seventeen (17) townhome units in four (4) buildings: Building A - 4 units; Building B - 7 units; Building C - 4 units; and Building D - 2 units Block 119, Lots 26-46 (proposed lot 26.01 in block 119) o Lots proposed to be consolidated into new lot 26.01 (44... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | New Jersey |
City | Franklin Township |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Manufacturing (Industrial), Residential, Commercial |
Article published date | 2024-10-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Manufacturing (Industrial) projects in United States of America
- SR 75 FROM SR 2 TO NORTH CAROLINA STATE LINE
- SR 20 FM PRESTON HILLS/LAUREL DR TO CR 715/REYNOLDS RD
- STRUCTURAL STEEL FABRICATION AND ERECTION
- SR 10 FROM CR 107/NORTH LEG DRIVE TO CR 2485/HALE STREET
- CS 493/INDUSTRIAL BLVD FROM SR 19 TO SR 31 - TIA
- SR 19;SR 23; SR 26 & SR 204 @ 9 LOCS - BRIDGE PRESERVATION
- PAULDING COUNTY ITS SYSTEM EXPANSION - PHASE II
- West lake sammamish parkway phase 2
