Townhouse Development
The status, timeline and source of this project. A free account opens every field.
Source: Dodge
complete demolition of the existing structure - erection of two townhouse structures, each include basements, interior parking garages with 20 spaces total (2 per garage with EV Charging), and private roof decks. For the proposed use of Multi Family Household Living (10 dwelling units) with accessory parking.
- Status
- Prospective
- Sector
- Commercial, Manufacturing (Industrial), Electric Vehicles (EVs), Car parking, Residential, Power Generation (CCGT), Automotive
- Location
- Philadelphia, Pennsylvania, United States of America
- Updated
- 19 Nov 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Townhouse Development
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | planning schematics |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | complete demolition of the existing structure - erection of two townhouse structures, each include basements, interior parking garages with 20 spaces total (2 per garage with EV Charging), and private roof decks. For the proposed use of Multi Family Household Living (10 dwelling units) with accessory parking. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Pennsylvania |
City | Philadelphia |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Commercial, Manufacturing (Industrial), Electric Vehicles (EVs), Car parking, Residential, Power Generation (CCGT), Automotive |
Article published date | 2025-08-04 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Commercial projects in United States of America
- I-20 FROM CARROLL COUNTY LINE TO 0.15 MI E OF SR 5
- SR 22 SPUR FROM 0.23 MI W OF CR 2111/REESE ROAD TO SR 22
- RELOC & STORE 121 BRIDGE BEAMS/529 R-E PANELS/PRES.PKWY
- West lake sammamish parkway phase 2
- 124th avenue ne corridor
- 98th avenue se (97th place se) and se 11th street slope stabilization
- School zone beacon replacement project
- I-90 eastgate to sr 900
